Contact for queries :

SAP ECC MRP Course Contents

Material Requirement Planning (MRP)
*Basics of MRP.
*Planning levels in Consumption based planning.
*Prerequisites for executing Consumption based planning.
*Difference between consumption based planning and MRP.
*MRP types in a SAP system.
*MRP data in a Material master.
*MRP Profile.
*Material Status and its customizing.
*Re-Order Point.
*Safety Stock
*Scheduling
*MRP Run
*Planning File Entry
*Process of Consumption based planning
*Executing MRP
*Control parameters of MRP run
*Plant and MRP group Parameter’s customizing.
*Planning Result
*Planned Orders
*Planning Evaluation
*Stock/requirement List
*MRP List
*Traffic Lights
*Material Tree
*Navigation Profile
*Exception Messages
*Lot Size Procedures
*Lot Size Rounding Profile
*Minimum and Maximum Lot Sizes

Safety stock
*Safety stock partially available
*Dynamic Safety stock
*Safety time
*Period Profile for the Safety Time

Procurement Types
*In-house Production
*External Procurement

Quota Arrangement
*What is Quota Arrangement
*Quota Calculations
*Quota Arrangement Usage
*Quota in MRP
*Requirement Splitting
*Minimum Splitting Quantity
*Lot sizes in Quota Arrangement
*Maximum and Minimum Lot Sizes
*Maximum quantity in Quota

Scheduling
*Scheduling for in-house production
*Scheduling for External procurement
*Backward Scheduling
*Forward Scheduling
*Customizing settings for Scheduling
*Reduction and Scheduling adjustment
*Changing dependent requirement dates

Copyright Notice

SAP®, SAP HANA®, SAP S/4HANA® AND SAP FIORI® IS/ARE THE TRADEMARK(S) OR REGISTERED TRADEMARK(S) OF SAP SE IN GERMANY AND IN SEVERAL OTHER COUNTRIES. DATA CONTAINED IN THIS DOCUMENT SERVES INFORMATIONAL PURPOSES ONLY. SAP AG IS NEITHER THE AUTHOR NOR THE PUBLISHER OF THIS PUBLICATION AND IS NOT RESPONSIBLE FOR ITS CONTENT. WE ARE NOT AFFILIATED WITH SAP. WE DO NOT HAVE ANY BRANCH.

top
© The Smart Hands. All rights reserved. Website Terms | Privacy

Subscribe to our Newsletter!

X